Construction of the area at the Zemgale Regional Waste Landfill “Brakšķi”, stages 1 and 2
Client
SIA “Jelgavas komunālie pakalpojumi”
Completion year
2024
Project description
Some of the construction works of Phase 1:
Construction of the site area, construction of a water supply pipeline of 353 m, construction of a sanitary sewage system totaling 239 m, construction of roof rainwater drainage totaling 442 m, construction of rainwater drainage of 1020 m, electrical supply – total cable length of 2000 m, construction of a pond.
Construction of asphalt concrete surface layer of 15965 m².
Some of the construction works of Phase 2:
Construction of asphalt concrete surface layer of 5119 m², site leveling and installation of a fertile soil layer of 3692 m².
Construction of the site area, construction of a water supply pipeline of 353 m, construction of a sanitary sewage system totaling 239 m, construction of roof rainwater drainage totaling 442 m, construction of rainwater drainage of 1020 m, electrical supply – total cable length of 2000 m, construction of a pond.
Construction of asphalt concrete surface layer of 15965 m².
Some of the construction works of Phase 2:
Construction of asphalt concrete surface layer of 5119 m², site leveling and installation of a fertile soil layer of 3692 m².
Other projects
Reconstruction of the 2nd and 3rd lines and the section of Namejs Street in Jelgava
Year: 2025
Reconstruction of Aizsargu Street in Jelgava
Year: 2024
Reconstruction of the Ābelīšu Road of the Salgale Parish Municipality, Jelgava Municipality
Year: 2024
Construction of a parking lot at 16 Laktas Street, Riga
Year: 2025