Design of phase 2 parking lot for building A, construction works, architectural supervision, and dismantling of building 37 (phase 1)
Client
VSIA “Paula Stradiņa klīniskā universitātes slimnīca”
Completion year
2024
Total amount
€1 004 619
Project description
Type of construction works – new construction of a parking area, rainwater drainage networks and lighting, CCTV, alarm notification, and electronic communication systems. Provision of design and supervisory services.
Road construction works.
Rainwater drainage networks (451 m)
Electrical supply (external) – lighting (643 m)
0.4 kV electrical supply (627 m)
CCTV, alarm notification (1024 m)
Design – Stage 1
Supervision – Stage 1
Road construction works.
Rainwater drainage networks (451 m)
Electrical supply (external) – lighting (643 m)
0.4 kV electrical supply (627 m)
CCTV, alarm notification (1024 m)
Design – Stage 1
Supervision – Stage 1
Other projects
Construction of a pedestrian and cyclist path along the state regional road P93 Jelgava – Iecava on the section from 3.20 km to 6.50 km (from Jelgava to the villages of Āne and Tetele)
Year: 2024
Pavement restoration on Rīgas Street in Salaspils and the construction of a roundabout at the intersection of Rīgas Street and Zvaigžņu Street, as well as the construction of the Zvaigžņu Street section from Rīgas Street to the roundabout at Lauku Street
Year: 2023
Vircava Sports Base – Streetball Court in Mazlauki, Vircava Parish, and Līvbērze Sports Base – Streetball Court in Vārpa, Līvbērze Parish
Year: 2025
Reconstruction of the Jelgava Municipality, Zaļenieki Parish municipal roads Tērvetes Highway – Baloži – Kalnamačas, Section 2 Workshop (No. 12) and Abgunste School – Rožlauki – Zanderi (No. 28)
Year: 2024